Day: May 13, 2018

Tips And Tricks For Planning A Bathroom Remodel

It’s really a pain to blog from my cell phone and my part 1 post a few days ago was really incomplete. Here’s to a sleepless night – I’ve been up for hours – and a couple of hours to do a little blogging.

Tear out the existing piping (Photos 5 and 6). Then frame the 2×6 walls that will contain the new plumbing and the opposite end of the shower base (Photos 8, 9 and 14). It’s easiest to nail the bottom plate to the floor and the top plate to the ceiling, then fill in the studs one at a time by toenailing them in at the top and bottom. Stack the studs directly in front of the old ones wherever possible. Space the studs in the center of the shower about 12 in. apart to leave room for the shower valve and showerhead. The studs behind the … Read More