Day: July 31, 2019

Master Bathroom Remodel

This was such a hard, but rewarding renovation. We did every little step (and misstep) ourselves after full days at work… demo, stud work, drywall, concrete floors, paint, installing toilets, sinks, faucets, and tile. The only thing we left to the professionals was installing the shower door (with glass that large, you’ve got to trust the professionals)!

The next step was is to refinish the kitchen cabinets. Now you could have the cabinets professionally refaced. Since I was going the rout of frugality, I opted to paint my cabinets and replace all the cabinet nobs and drawer pulls with all new hardware. Because our children were little when we bought this cabinet we fitted a hook fastening at the top. Although this cabinet is very stable, if you bought a similar one that was less stable, you could use a bracket to fasten it to a wall so avoiding small … Read More